Thursday, March 28, 2013

SENECA POINT UPGRADE


At the March 26 Legislative Meeting, Council members Hodge, Bowlesby and McCarthy voted in favor of the Consent Order timeline which was based on the assumption County Government would be introducing the Membrane Bio Reactor (MBR) System into our current system at Seneca Point (NEWWTP).   However, given the information I have been supplied by Director Flanigan and Principal Planner, Tony DiGiacomo, I cannot support the MBR System at this time. At the time of the vote, President Hodge acknowledged DPW needed to provide the information of an analysis to justify this costly investment and that we were not obligated to use the MBR system by adopting this consent order.  Time will tell if he was sincere in pursuing the cost and process analysis.  To implement this system it will cost $40 million to get back to the same capacity we currently have -  2 mgd.  How was this project permitted to move forward?

The impetus for making this costly investment is the MDE (Maryland Department of the Environment) requirement for this plant to go from BNR (Bio Nutrient Removal) to ENR (Enhanced Nutrient Removal).  MDE only funds upgrades to ENR and not for expanding capacity.  DPW hired a consultant (GHD) to research how much it would cost for the Seneca Point to go to ENR and their estimate was $10.9 million to use a denitrification system.  This is the amount that MDE agreed to fund Cecil County and DPW Director proposed we instead use the $10.9 million as a down payment on a system that allows us to become ENR compliant but would also allow Seneca Point to increase capacity up to 10 mgd on the current foot print without having to purchase additional property. While the MBR System does allow for additional expansion, it does so at a very expensive price ($40 million) with no additional capacity for that down payment.  To expand to 4.0 mgd, the cost will be an additional $29.5 million.

What other options are available?

We can become ENR compliant with the conventional ENR Bioreactor with denitrification filter at the current design capacity of 2 mgd approved and fully funded by MDE. The $10.9 million of the Bay Restoration Grant Funding was assessed by the work of our consultant in accordance with MDE direction which researched the most inexpensive method for our plant to go to ENR.

How long before we will use the current capacity of 2 mgd?  The population growth has been reduced from previous projections according to Principal Planner, Tony DiGiacomo.  “For the year 2030, based upon WILMAPCO Traffic Analysis Zone (TAZ) projections and reduced by a coefficient of -0.0558 to take into account the latest, reduced MDP control total, I came up with the following population and household projections for the Seneca Point service area:  Pop: 18,237, and HH: 6,706.”

Assuming that the flow at Seneca Point increases from the present day 1 MGD to 2 MGD between now and 2030, this would represent a growth rate of 4.2% per year. The economy, in general, is expected to grow around 2% in the future, according to many economists.  So a growth rate of 4.2% for the population would be estimated on the high side.

Currently our system has 4,370 active sewer customers.  Averaged at 100 gpd/per person or 225 gpd/per household we should arrive at about 1 mgd current capacity.  Based on the last 18 years of growth at the North East Waste Water Treatment Plant, the projected flows for the years 2030 and 2035 would fall between 1.6 and 2.0 mgd assuming the old growth projection.  But based on the updated population projections for 2030, the flow projections, I believe, fall between 1.5 and 1.8 mgd.

Is there a cheaper, alternative science to the Membrane Bio Reactor?  One option that is currently being used in Carroll and Washington County, the Biomag System.  The cost on average is about 1/2 of the MBR.  While it was relatively new 3-4 years ago, Siemens has purchased the technology due to its promising results.  The Biomag capital costs are significantly lower than MBR and can also expand their capacity on the current footprint.

Because waste water treatment science is evolving, there very well could be a cheaper alternative than the MBR solution if we wait.  What have we lost in the meantime? Absolutely nothing.  We are not required to finance the additional $30 million (which only brings us back to 2 mgd capacity), it appears we have ample capacity up until at least 2030 to 2035, and we have kept our options open.   We may find Meadowview will require increased capacity or upgrades before Seneca Point.  Also, imagine we instead invested the $30 million into closing up the infrastructure gaps on the growth corridor to attract growth.  Wasn't that supposed to be our priority in the first place?  .

To get a more accurate count of capacity at Seneca Point, we need to know the policy for reserving space at the treatment plant.  I requested this clarification from Director Flanigan on February 4 asking if already issued sewer allocations have a 2 - year “shelf life”?  I have also asked how long in his estimation do we have before we reach 2 mgd capacity?  To date, he has not responded.  Until I have answers to these questions, I don’t feel confident in moving forward or feel it’s fair to put the burden on this system on the users, new customers and tax payers since we‘ll probably have to finance the system with a long term bond.

I would propose that we conduct a full scale pilot study to assess the viable options and then provide a cost analysis on capital costs as well as the operation and maintenance costs for each option.   It seems to me this multi million dollar decision to commit to the BMR System should have rose beyond the staff and administration.  But we still have time to gather the information to make an informed decision.

I wanted to point out that while I'm not an expert on Waste Water Treatment Plants, I was able to gather the information from the experts after investing a lot of time and research. Because I am responsible for making informed votes, the Inhouse Auditor could make my job easier and potentially save the county more money than the position would cost.

Sunday, January 20, 2013

Was Robert Hodge Stealing Electric?

Below are two documents which were presented at last Tuesday's worksession (January 15, 2013) by Councilman Dunn.  These documents and allegations are so shocking that I expected The Cecil Whig to cover the story.  Instead, Councilman Hodge, McCarthy and newly appointed Councilwoman Bowlesby voted to support the appointment of Mr. Hodge as President and said the allegations were irrelevant because they occurred back in 2008.  No story was ever printed despite many people believing it is relevant.  For the audio of the discussion:  http://www.ccgov.org/cmup/ws/01.15.13.worksession1.amend%20agenda.mp3
at 6 minutes and 8 seconds.  If this matters to you - or not - I'd like to hear what you have to say.    Please send me an email at diana.broomell@gmail.com with your feedback. 

Wednesday, December 26, 2012

History of Charter

Did you know Cecil County holds the record for the most attempts at passing Charter?  It took six tries because many were suspicious of giving so much power to a County Executive.  But, of course, there were those that were not going to give up their quest and on the last attempt creatively marketed Charter into a bait and switch of Code Home Rule.  The Friends of Charter claimed it would be cost neutral and more efficient.  However, many are already realizing they were deceived and are having second thoughts.  How could Charter get on the ballot despite Cecil County Citizens formally voting for Code Home Rule in a straw poll vote after the taxpayers paid $12,000 for an Alternative Government Forum?  To see how Charter was "pushed" through, I've put together the History of Charter below. 

  • Four alternative government forums were hosted by Victor Tervala who wrote Alternative Forms of Government in Maryland. Paid for by Cecil County Tax Payers ($12,000 +).  (Cecil Whig, 10/25/07) 
  • Straw vote at the last forum held in Elkton Administrative Building showed that the voters chose Code Home Rule over Charter.
  • (Cecil Whig, 12/12/07) (Cecil Whig, 2/4/08)
  • Commissioners ignore voters choice and vote for Charter Government.
  • (Cecil Whig, 3/5/08)
  • Commissioners reconsider Code Home Rule after public testimony.

  • (Cecil Whig, 4/30/08)
  • Commissioners honor vote 4 to 1 to put Code Home Rule back on the Ballot.

  • (Cecil Whig, 5/21/08)
  • Public hearing held on June 5, 2008 documents citizens support for Code Home Rule again.

  • (Cecil Whig, June 6, 2008)
  • 11th hour Code Home Rule effort fails.

  • (Cecil Whig, 8/6/08)
  • Board of County Commissioners decides in closed session to pursue Charter and the first mention of a Charter Board being appointed is when the names are voted on during an evening Commissioners meeting.  (Cecil Whig, 3/6/09)  (County Commissioner Meeting Minutes 3/3/09) 
  • Charter Board schedules meetings with citizen groups to promote. Citizens raise a number of concerns: Charter is a lot more expensive than the Charter Board claims because County Executive has a staff and concerns of balance of power between Legislative and County Executive.  Harford County is a good example of how Charter Rule promotes increased spending. (Aegis 7/25/12)
  • Chairman of the Charter Committee, Joyce Bowlesby criticized for funding Charter initiative with out-of-county developer funds, $12,000. Office of Economic Development chastised for participating in the fundraiser for the Charter Campaign.

  • (Someone Noticed, September 30, 2010) (Someone Noticed, October 20, 2010) (Someone Noticed, October 27, 2010)
  • Joyce Bowlesby makes claim Charter costs less than current form of government. Many citizens attending Charter informational forums critical of claim.

  • (Cecil Whig, April 9, 2010) 
  • County Government employees used to promote Charter (Cecil Whig, 6/24/09)
  • Newly elect County Executive Tari Moore switches her party affiliation to unaffiliated.  (Cecil Whig, December 3, 2012)
  • Sunday, December 2, 2012

    MORE OF THE SAME

    MORE OF THE SAME

    This is a great opportunity for Mike, Jim and I to finally get our message out about the voting record of Commissioners Moore and Hodge. The local media - especially the Guardian and Cecil Times - have continually misrepresented the truth. The insulation these two media outlets provided along with their foot soldiers, the Cecil County Patriots (who actually support special interests over tea party principles), have provided the political cover needed by Commissioners Moore and Hodge. Congressman Andy Harris along with Senator Jacobs have also interjected themselves into local politics to support this machine. David Williams of Williams Chevrolet chairs the Cecil Business Leaders for Better Government PAC that endorsed Commissioners Hodge, Moore and Alan McCarthy. Mr. Williams started attending county commissioner meetings around the time that hearings for Rose’s Diner (to become a drug treatment facility) began. Coincidently, the Williams Family already owns the Elkton Treatment Facility. David Williams is the brother of D’ette Devine, our superintendent of public schools. The Cecil Business Pac endorsed the purchase of the Basell Building, as well as the Chamber of Commerce that named CCPS large business of the year.

    Why did I get involved in County Politics over 20 years ago, become a founding member of the 21st Century Republican Club, organize the first two tea party protests in Cecil County, campaign for an elected school board, as well as host Drug Awareness forums and workshops? Because we don’t need more politicians selling out the county. We need more concerned citizens who have the best interests of Cecil County at heart.

    Cecil County Citizens and tax payers, you should be very concerned about the future direction of your County.

    Tari Moore’s move to renounce the Republican Party in order to hijack control of the new Cecil County Council insures special interests will now effectively control both the Executive and Council side of our new Charter form of government.  Where are the checks and balances if the County Executive controls both the Legislative and Executive side of government?  


    What does this mean? You only need to review Moore’s voting record for the two years that she’s served as a County Commissioner. Most of her votes were in unison with Commissioner Robert Hodge supporting special interests, while the other three Republican Commissioners voted on principles that supported fiscal responsibility, transparency and accountability.

    - While the majority of Commissioners voted to adopt a tax rate below the constant yield for the first time in Cecil County History, Commissioners Moore and Hodge supported putting back $800,000 into the budget. You can listen to his explanation on the audio at 5:30 and on the final budget adoption audio at 22:50.

    - The majority of Commissioners voted to support increased ethics enforcement while Commissioners Moore and Hodge basically said more ethics doesn’t mean more honesty.


    - The majority of Commissioners voted to organize and challenge the State of Maryland’s mandate to adopt tier maps as well as WIP Plans by activating the Rural County Coalition and the Clean Chesapeake Coalition.  In contrast, Tari Moore sat on the MACo Executive Board, and testified in support with amendments for SB 236. Once the finalized version was drafted, she did not update nor seek feedback from the Board of County Commissioners, DPW and Planning and Zoning Directors on how the bill would impact Cecil County, thereby causing us to lose the ability to voice our concerns.

    - The majority of Commissioners supported funding capital projects in the priority funding area while Commissioners Moore and Hodge supported spending $4 million (Commissioner Hodge comments at 36:48) in areas not slated for growth that also happened to be near or adjacent to Commissioner Hodge's property.  While Commissioner Hodge recused himself on the vote, he did share his comments in support.

    - The majority of Commissioners successfully argued that a local propaganda newspaper, the Cecil Guardian, was not a newspaper of record (as noted on page 2 and 3) and therefore was not qualified to receive the hundreds of thousands of dollars from county government to print public notices while Commissioners Moore and Hodge supported giving the tax payer funded dollars to the Cecil Guardian for, in my opinion, political payback.

    - The majority of Commissioners supported a new clinic ordinance that adopted minimum standards for buffers and parking requirements, while Commissioners Hodge and Moore supported no more oversight in placement of clinics because in their view, it was not the way to do business in the county. They tried to circumvent the new ordinance by attempting to get an occupancy permit for the Drug Treatment Facility that was being proposed for Rose‘s Diner in Elkton.

    - The majority of Commissioners objected to Commissioner Hodge’s attempt (with Tari Moore’s support) to rezone a large parcel of his property from NAR to a more lucrative, developer friendly RR during a Comprehensive Rezoning. The majority of Commissioners demanded he follow the normal rezoning process for all seven of his personal comprehensive rezoning requests (which requires public notification to adjacent property owners).

    - Did Commissioner Hodge initiate the County lawsuit with the Town of North East (over out of town water and hookup rates) for personal reasons. Was it coincidence that the PSC Letter was sent 2 days after Commissioner Hodge was elected to office?  The fact remains that he went out his way to get one of the Commissioners to change his vote to pay for a 2nd expert witness and he did not recuse himself from any votes as a Commissioner regarding this lawsuit despite his property being affected and therefore, in my opinion, creating a conflict of interest. I am also concerned that the attorney hired to represent the County on this case, Larry Haislip, is also a campaign contributor to Commissioner Robert Hodge. It just seems that there is a pattern for Commissioner Hodge to use Cecil County as his personal piggy bank and Commissioner Moore has consistently voted to support him.

    - While the majority of Commissioners were fighting to break up unilateral Artesian control of our water and wastewater plants, Commissioners Moore and Hodge were fighting to preserve the original contract which would have put our County and our master plan for growth in peril because the monopoly would have been more focused on profit and building residential projects rather than implementing infrastructure in the growth corridor.

    - The majority of Commissioners objected to using fund balance
    to purchase the Basell Building
    for a School of Technology. They disputed the renovation as well as the operating costs that CCPS provided. Another reason for the objection was that it was not a true comparison of savings, as this was another School of Technology and not a Comprehensive High School. The school population has decreased since 2006, and the School Board has not presented to the Commissioners other viable options to accommodate the waiting list.

    - While the majority of Commissioners were fighting to keep our AVI decals for the Hatem Bridge and fighting the increase in tolls, Commissioner Hodge wanted to seek SHA road improvements in return for toll hikes.    He stated this at the bridge toll coordination meeting and also when he was interviewed by Reporter David Collins.  I told the reporter that the majority of Commissioners did not agree to this and the interview thankfully wasn't broadcast. The road deals were also included in Vernon Thompson's (Ec. Dev. Director at the time) speech he was planning to give at Perryville High School before the MdTA.   I also remember staying at that toll meeting close to midnight because Commissioner Hodge was the 3rd to the last speaker and I needed to make sure his testimony didn't include anything the Board hadn't already discussed.   He also sought advice from Mary Halsey, CEO of Cecil Bank, on how to fight the toll hikes. He thought it was a good idea to get a board member of the MdTA to advise us but the only problem was, she voted to increase the tolls and she's from Cecil County!


    - The majority of County Commissioners voted to request that Vernon Thompson resign as Economic Development Director of Cecil County while Commissioners Moore and Hodge fought to preserve his position.  This was even after it was revealed that Vernon Thompson tried to sabotage the funding for the Upper Shore Regional Council in direct insubordination of the Board of County Commissioners.  I shared this information with Commissioners Hodge and Moore as well as the media after information verified through DBED was shared with Commissioner Mullin and myself. 

    - The majority of Commissioners supported improving animal control in the County while Commissioners Hodge and Moore attempted to subvert the new changes to animal care and control by stonewalling with excuses of needing more time, data to research as well as even more public hearings after 3 years!  Nancy Schwerzler (previous President of the SPCA during their negative publicity) started a public blog, Cecil Times, that also provides political cover for Commissioners Hodge and Moore.

    - The Enhanced Use Lease Project by Help USA (organization founded by Andrew Cuomo) is fighting to get project based vouchers to fund their housing project at Perrypoint which would not benefit our veterans. Despite both local and county government sharing their many areas of concern, Dr. Hameline continues to provide the perception that everyone is in support. Our concern has been documented and it includes increased public services generated due to the population they are targeting with no compensation. We have requested Congressman Harris to intervene. His response is that he will intervene when it is “appropriate”. Commissioner Hodge called me personally to ask what my objection was to this project and this was after the Board of County Commissioners agreed on how to proceed.

    - Finally, the majority of Commissioners' campaign funding was primarily grass roots while the majority of Tari Moore’s and Robert Hodge’s were funded by special interest. Mr. Hodge was part of a business slate endorsed by Cecil Business Leaders for Better Government which raised over $40,000.  Their mailers included the slate of Moore, Hodge, McCarthy and Judges Cairns and Baynes.  You can also review their individual campaign reports at Maryland Campaign Finance . Who do you think they will represent when they get unilateral control of the county?

    Friday, August 24, 2012

    Response to Cecil County Business PAC Letter

    Recently, you may have received a letter from Cecil County Government informing you that Cecil County is in the process of developing a Tiers Map as required by Senate Bill 236.  We, as a Board of County Commissioners, agreed it was important to notify the landowners with 20 or more acres on the effect this legislation would have on their properties. It's come to my attention that you may have also received another letter from David Williams on behalf of the Cecil Business Leaders which grossly misrepresents the facts.

    I am in opposition to Senate Bill 236 and any State legislation which usurps the authority of local planning. While I believe the State has overstepped their authority and this is just the beginning of the Plan Maryland doctrine, our Planning and Zoning department recommended to not ignore SB 236 because the State could later impose penalties for our refusal to cooperate.

    A guidance document for implementing the Tiers was provided by the Maryland Department of Planning and stated that Conservation Areas, Priority Preservation Areas and contiguous blocks of forested or agricultural areas were required to be located in Tier 4. I have advocated a map which reflects the adopted 2010 Comprehensive Plan with more of the Tier 4 removed and placed into Tier 3. The map which Mr. Williams supports selectively removes portions of Tier 4 which benefits certain landholders over others. The Planning Commission at their August 20 meeting agreed with my proposal that we use a policy that is fairly and equitably applied in the Tier 4 area and tasked Planning and Zoning to come up with those policies.

    I especially believe it is egregious that the Tier 4 area will be downzoned and had requested that the letter going to the landowners in the Tier 4 area include the sentence: “Because the Tier 4 designation changes the density in the NAR from 1-10 to 1-20, many landowners believe the resulting devaluation of properties is unfair and an abuse of power by the State of Maryland.” The other Commissioners did not want to include because the letter was coming from our Planning and Zoning Director and they didn’t feel it was appropriate.


    Below are recorded audios from previous public meetings in which I shared my position on this issue:

    http://www.ccgov.org/uploads/PlanningAndZoning/AudioUpload/Aug%202012%20PC.mp3 Comments start at 1:12:45.
    http://www.ccgov.org/cmup/ws/08.28.12.worksession11.commissioneritems.mp3 Comments start at 8:05.
    http://www.ccgov.org/cmup/08.21.12.boccmeeting2.informationalitems.mp3 Comments start at 14:50.
    http://youtu.be/0L1GB1Poc3Q  Comments start at 33:25

    Cecil Whig Letter to the Editor - Not Printed

    I have been a strong advocate for the agricultural industry in Cecil County in my support of agricultural preservation programs, expanding allowable agricultural uses, promoting value added farming, supporting the farm museum and nominating a representative for the agricultural community to serve on the Economic Development Board. In the August 22 edition of the Cecil Whig, the picture on page A11 indicated that Cecil County Farmers protesting SB 236 also posted a sign “Please Stop Broomell”. Wayne Stafford, President of the Cecil County Farm Bureau, assured me that it was not one of their signs. I was later told by a fellow Commissioner, Robert Hodge, that this was the same sign which Cecil County Patriot, Ron Lobos, has used in other locations. For the record, I do not support the State’s mandate on the Tiers map and I have advocated a map which reflects the adopted 2010 Comprehensive Plan and would like to see more of the Tier 4 removed and placed into Tier 3. The map which the Patriots and the Cecil County Business PAC support selectively removes portions of Tier 4 in an arbitrary manner and includes portions of Commissioner Hodge’s property on the Elk Neck Peninsula. The Planning Commission at their August 20 meeting agreed with my proposal that we use a policy that is fairly and equitably applied in the Tier 4 area and tasked Planning and Zoning to come up with those policies.

    How to Prioritize our Capital Projects

    Statement read at the 7/31/12 BOCC Worksession Meeting: What is the Board of County Commissioner’s policy for prioritizing bridge repairs as well as the scope of bridge repairs? I previously posed this question to Director Flanigan and was told that several factors weighed into this: cost, current and anticipated use, location (whether it’s in the priority funding area or outside), and I would like to include political will. It has become increasingly apparent that the scope of the Old Elk Neck Road project from just a simple replacement to a large infrastructure expansion outside of the priority funding area is being driven by this very issue. If you argue the large infrastructure overhaul allows for emergency equipment to cross the bridge for improved emergency response, bridges for Mill Lane in Earleville and Rolling Mill in North East were also supported by the local fire departments for improved emergency response. After speaking with many citizens in the Old Elk Neck area, the overwhelming majority agree a bridge replacement would be adequate for this area and understand why it would not be fiscally responsible to invest close to $5 million in a non priority funding area. If we did a bridge replacement minus the road widening and some of the other improvements, I believe there would be enough revenue to replace the bridge at Rolling Mill and possibly complete some of the work on Mill Lane. If we do bridge replacements we need to make sure all the taxpayers are being served in an equitable manner and that the Board of County Commissioners are following a policy that is consistent across the board. I contacted Phillip Pearce who headed up the Friends of Mill Lane and he provided a history on how the Board of County Commissioners at first agreed to reopen this area for traffic but then, he believes, succumbed to political will from a commissioner that lives on this road and likes his privacy. I’m not sure if that’s the case, but I do want to explore if there is funding still available from the Spectron Settlement that was previously approved to be used for remediation on Scotchman Creek. The previous $3.2 million estimate to reopen the road is no longer valid because a dam replacement is not possible and other less costly options which include installing a culvert have not been assessed. I have also contacted a representative from Benjamin’s Lumber in North East and they have actively pursued the replacement of Rolling Mill Bridge. The Mayor of North East also confirmed that he would pursue financing with his board to help with the replacement of the bridge. Director Flanigan and Director Brooks as well as the local fire department and police have also identified this bridge replacement as critical due to water plant issues, emergency response and access to local business and alleviation of traffic congestion. Director Flanigan also stressed that it should be the position of the County that only as a last resort we would remove a bridge from our inventory because once that road is closed, it’s difficult to open it back up and it’s in the county’s best interest to not take any bridges off our inventory list.

    Basell Building Is Not a Wise Purchase

    On Thursday, June 11 I attended the 7:30 am CCPS Meeting to request the purchase of the Basell Building for a new School of Technology. The presentation sounded very convincing and provided many reasons to support. However, there are two sides to every story and I would like to provide some of the reasons why I am not in support. Let’s be clear, this is not a comprehensive high school. Many agree that too much time is lost in a student’s day with the current format of reporting to two different schools in one day. A Comprehensive High School would include all of the classes. The number of students attending Cecil County Public Schools has decreased since 2006 and as a result, the State will not fund a Comprehensive Technical High School. Probably a good reason CCPS should not be expanding their school infrastructure at this time in this economy. With additional buildings comes additional operational costs per year (staff, maintenance, etc.) and that funding would be put to better use on CCPS current programs. The substantial increase in operational costs for a new building will likely mean an increase in taxes and at this time the Board of County Commissioners has agreed to not raise taxes. When the school populations increase and the State funding kicks in for the new Comprehensive High School, the current site location adjacent to Cecil College would make more sense in partnership opportunities with the college. It should be mentioned, we have already invested on engineering plans for this location. If we purchased the Basell Building, the Comprehensive High School will be scrapped and CCPS will be committed to the current format of a technical school instead of a comprehensive high school. Why haven’t we explored other less costly options for expanding the School of Technology? Individual technical programs could be located in schools that are below capacity. I see that CCPS currently rents space on Bridge Street? Why isn’t that an option for individual technical programs? Has CCPS fully explored opportunities with the private sector to contract out some of their programs? Treasurer Feehley had explored initial cost options for Cosmetology Programs: Private sector charges $5,500 per student and it’s $12,000 per student cost with CCPS. The other reasons which ultimately led to my vote: (1) The Basell Property is prime real estate attractive to research and development companies, (2) We would lose the property tax revenue which is currently over $65,000 and with 90 acres at the site there is a much higher potential for the future, (3) Renovation costs which CCPS projected seem to be unrealistic. CCPS did not include the replacement of the HVAC System and initially the school said the $44 per square foot renovation cost was low because they were only renovating what they would be using (1/3 of building to start). I agree that quality of education greatly affects economic development which CCPS used to justify taking the Basell Building offline. But once you are presented with all of the facts, I believe this proposal is not a wise investment for CCPS or economic development.

    Letter from Cecil County Consultant, GHD








    Need for a Stronger Ethics Ordinance

    Letter to the Editor
    Cecil Whig
    November 29, 2011

    “The Ethics Process will only work if it is enforced.”
    This was the comment made by our current Chairman of the Ethics Commission, Michael Burns, and I agree. In 2011 there were 12 who never filed a required disclosure form and I support Mr. Burn’s recommendation that we remove those serving on boards that fail to file and ignore repeated requests. What motivation is there to file disclosures if there is no penalty?

    I would also propose: 1. Department Directors file the same disclosure requirements as elected officials, 2. Appointments to committees file the same disclosure requirements as in 2011 rather than no disclosures at all, 3. Ethics Board Members file the same disclosure requirements as proposed for appointments, and 4. County Commissioners are informed when an initial complaint is filed to ensure the complaint has been addressed in a timely manner. (Details of the complaint should not be disclosed unless there is a finding of guilt.)

    In my opinion these are reasonable requests that are vital to the integrity of the ethics process. I was somewhat surprised by the comments of Commissioner Hodge: “We have a responsibility to not request this information” or "Sometimes people would like to keep their personal information personal.“ And Commissioner Moore asked, “How would this make someone a better committee member?“ My answer is that transparency helps keep everyone honest.